Construction Readiness Scoring
5 points
Conceptual Design Infrastructure projects with basic conceptualization and design (i.e., at least 30% design ).
Preliminary Design Infrastructure projects with refined and detailed design, including major systems, materials, dimensions, and draft specifications (i.e., greater than 30% design ). Detailed Design Infrastructure projects with detailed drawings and specifications for bidding, permitting, and actual construction (i.e., 90% design or greater ).
15 points
30 points
© Tidal Basin Group and Michael Baker International. All rights reserved. 14
Powered by FlippingBook